LONG Completes SUE Services for Southern Company Gas in Cherokee County
LONG recently provided the Subsurface Utility Engineering (SUE) services for the 5.8 mile Phase II segment of this Wade Green Road project for Southern Company Gas in Cherokee County, GA.
SUE field designations for all subsurface utilities were performed beginning at Baker Rd and Jiles Way and ending at GA Hwy 92 and Wade Green Rd for the installation of a new 12” high-pressure gas main to bring greater capacity to the area for growing demand. The proposed pipeline route was dense with underground utility congestion including fiber optic, water, telecom & power all within the limits of proposed design. LONG’s team coordinated with the design team throughout to ensure incorporation of the existing utility conditions into the overall database survey for design. LONG provided SUE QLB (Designating) & SUE QLA (Test Holes) per ASCE 38-02 SUE standards.
#golong #subsurfaceutilityengineering #team