LONG was proud to be a part of the construction of Lawrenceville Performing Arts Center. The Center is a $31 million, 50,000 square foot addition to Lawrenceville’s Aurora Theater.
The Center includes a 500-seat theater with an orchestra pit, a convertible cabaret theater for smaller crowds and additional rehearsal space. The Center is home to Georgia’s second largest professional theater company and has one of the largest stages in the state.
Long Engineering (LONG) prepared demolition plans, a detailed site and grading plan (including improvements for front door drop off on North Clayton Street) and a utility and erosion control plan.
The Center has been open for almost a year now and is home to so many spectacular productions.
#golong