SR 11 Bridge Replacement in Monroe, GA

SR 11 Bridge Replacement:

LONG was responsible for roadway construction plans for the replacement of the existing bridge on SR 11 over Apalachee River just north of Monroe, Georgia. With a project length of approximately 0.6 miles, the project had several historical and environmental resources to avoid during the design. The existing bridge, constructed in 1942, was replaced with a new offset bridge while maintaining two lanes of traffic and staged construction throughout the duration of the project. State Route 11 at this location is a rural two-lane roadway with 12′ travel lanes and rural shoulders.

See before and after images below:

#civilengineering #bridges #golong

GDOT Selects Long As Prime Consultant For Bridge Replacement Project in Houston County

Long Engineering (LONG) was recently selected as the prime consultant for the bridge replacement project at SR 7 over Flat Creek in Houston County, 3 miles southwest of Perry. Atlas Technical Consultants and will be providing Quality Assurance and Geotechnical Services, and Anthony Kamburis, PE (LONG) will be our project manager.

We have had the privilege of partnering with GDOT for the past 15 years and we are looking forward to continuing our work with GDOT!

#engineering #team #golong