Stout Parkway Bridge Replacement at Gothard’s Creek

Lithia Springs, Georgia

This project was a turn-key bridge replacement designed to federal standards for the local government. Design work included survey, roadway design, bridge design, hydraulic analysis, erosion and sediment control, geotechnical investigations, environmental permitting. Project issues included adjacent driveways and an intersection that had to be left open during construction.