Mercedes-Benz Stadium

Atlanta, Georgia

Provided photo control for aerial mapping to accelerate the design schedule and subsequently performed a boundary, topographic and utility survey on a 48-acre parcel referred to as the “North Site” north of the Georgia World Congress Center. Then provided photo control for the “South Site” located south of the Georgia Dome and followed up with a boundary, topographic and utility survey of the 39-acre tract that included property acquisition plats and roadway abandonment plats. Also included was construction staking of the stadium, continual surveys of targets on the roof truss to allow settlement calculations, and preparation of as-built drawings.