I-85 Widening Project

Gwinnett, Barrow, and Jackson Counties, Georgia

Long Engineering provided full service database for a 20-mile corridor of I-85 from Hamilton Mill Road to State Route 11 (Jefferson Bypass). Services included static and RTK GPS networks, hydraulics surveys, and right-of-way resolution. The database was used in design of the express lane project. Long Engineering utilized four survey field crews and two Registered Land Surveyors simultaneously on the project to maintain the aggressive schedule.