Green Infrastructure Project

Atlanta, Georgia

The Green Infrastructure Project employed green drainage improvements that included bioretention, pervious pavers, sidewalk planters, and street islands. Services included setting horizontal and vertical control, boundary, topographic and utility surveys along approximately 5,500 feet of full width city streets and 5,500 feet of half width city streets in downtown Atlanta. Additionally, a boundary and topographic survey of a 3.2-acre Atlanta Housing Authority parcel that was used to provide an underground combined sewer peak attenuation vault was completed.