15th Street Substation

Augusta, Georgia

Georgia Power Company contracted with Long Engineering (LONG) to provide Subsurface Utility Engineering (SUE) and Land Surveying services for their 15th Street substation upgrade in Augusta, Georgia. LONG provided records research to determine potential utilities in the area along with substation as-built drawings. Quality Level B (QLB) designating was then provided for the 4.4-acre site. Each utility was designated and marked with paint and flags. The designated marks were surveyed, reduced and drawn in DWG format. Deliverables included an AutoCAD file, control values and sketches.

Location

Augusta, GA 

Client

Georgia Power Company

Services Provided

Subsurface Utility Engineering (SUE), and Surveying 

Date Completed

2020