SR 109, GALLATIN, TENNESSEE, TENNESSEE DEPARTMENT OF TRANSPORTATION

Another Tier 2 Study was performed along SR 109 from Interstate 40 to the SR 109 bypass in Gallatin, Tennessee... CLICK HERE to view project details.

SR 397, WILLIAMSON COUNTY, TENNESSEE, TENNESSEE DEPARTMENT OF TRANSPORTATION

Long Engineering, Inc. performed a study of SR 397 in Williamson County, Tennessee... CLICK HERE to view project details.

STATEWIDE TRANSPORTATION PLANNING TASK ORDER CONTRACT, TENNESSEE DEPARTMENT OF TRANSPORTATION

Long Engineering, Inc. won this two-year contract to provide statewide planning, transportation safety and traffic engineering services... CLICK HERE to view project details.

PEACHTREE DUNWOODY TRAFFIC SIGNAL IMPROVEMENTS, PERIMETER CENTER IMPROVEMENT DISTRICT

The Perimeter area is home to over 4,000 businesses, numerous medical facilities, 6 million square feet of retail space, and over 40,000 residents... CLICK HERE to view project details.

CONSOLIDATED RENTAL CAR COMPLEX (CONRAC) TRAFFIC OPERATIONAL ANALYSIS—HARTSIFIELD JACKSON ATLANTA INTERNATIONAL AIRPORT

This project involved traffic engineering and operational analyses of both internal and external traffic operations for the new Consolidated Rental Car Facility... CLICK HERE to view project details.

STP-00MS (384), SR 128 & SR 49
Concept Reports
Macon County, Georgia

The project included a package of four concept reports for improvements to four separate intersections on SR 128 & SR 49 to create a new truck route through Oglethorpe, GA. Work included geometric and signage review to determine geometric improvements necessary to allow trucks with dual semi-trailers to navigate the proposed state route change... CLICK HERE to view project details.

State Route 306
Traffic Engineering Reports
Forsyth County, Georgia

Forsyth County, GA entered into an agreement with Georgia DOT to improve two major intersections – SR 306 at Shadburn/Parks Road and SR 306 at SR 53. Both intersections were two-lane roadways on all four approaches with high volumes of traffic (>20,000 vpd) on the mainline at both intersections... CLICK HERE to view project details.

State Route 133,
Colquitt / Worth / Dougherty Counties, Georgia

SR 133 is a 32-mile long roadway improvement project from Moultrie, GA to Albany, GA.  The existing roadway is a two-lane rural section with a 55 mph speed limit except the section through the City of Doerun... CLICK HERE to view project details.