Stockade Basin Sewer Separation
Atlanta, Georgia

Long Engineering, Inc., as a major subconsultant to PBWater, was selected to provide engineering and surveying services in the planning, design and construction administration of the complete separation of combined sewers in the Stockade Basin in accordance with the current Authorized CSO Remediation Plan... CLICK HERE to view project details.

Noonday Creek Sanitary Sewer Trunk Line
Atlanta, Georgia

Long Engineering, Inc. was selected by the City of Woodstock to perform a basin analysis for the Noonday Creek trunk where a 50 year projected flow of 24 MGD was estimated.  A survey of the existing 12” Noonday Trunk was performed as well as two other trunk lines encompassing 20,000 feet of sewer. A route analysis was performed and construction documents prepared for 5,500 feet of 42” relief line at 0.10%...CLICK HERE to view project details.

DEKALB COUNTY WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM STUDY

Long Engineering, Inc. is on a project team with Brown & Caldwell to provide GPS-based surveying for the entire DeKalb County Water Distribution and Wastewater Collection System Study... CLICK HERE to view project details.

GWINNETT COUNTY WATER RESOURCES

Long Engineering, Inc. is under contract with Gwinnett County Water Resources to perform survey services as-needed, with one year contract renewals available for five years... CLICK HERE to view project details.