Hartsfield Jackson Atlanta International Airport
Fifth RunwaySullivan Creek
Atlanta, Georgia
Long Engineering, Inc. performed the hydrologic analysis for the Site Preparation of Phase 2 of Hartsfield Jackson International Airports massive Fifth Runway Project... CLICK HERE to view project details.
Centennial Place Flood Analysis
Atlanta, Georgia
The engineering firm performing the site design services for Centennial Place retained Long Engineering, Inc. to evaluate maximum flood elevations from the combined sewer system lying below and adjacent to their site... CLICK HERE to view project details.
Georgia Institute of Technology Administration Building
Atlanta, Georgia
Georgia Institute of Technology commissioned Long Engineering, Inc. to determine the cause of frequent flooding of the basement below Junior's Grill in the Administration Building... CLICK HERE to view project details.
Glenwood Park
Atlanta, Georgia
The 27 acre Glenwood Park Project was located in the Stockade Trunk Basin, a watershed that became combined downstream of the property at the Stockade Trunk... CLICK HERE to view project details.
Wolf Creek Drainage Analysis
Atlanta, Georgia
The City of Atlanta had declared this 0.7 acre residential lot un-buildable because it was almost entirely within the 100-year floodplain of Wolf Creek. Recent legislation prohibited further development in the basin due to the severity of flooding in the downstream reaches... CLICK HERE to view project details.
|